Blog
Discover our latest articles and blogs

As-Built Drawings Process for Trade Subs: Field to Closeout
A step-by-step as-built drawings process for trade subs: mark up in the field, check against a checklist, submit clean records and get retainage released.

Timecard Approvals for Trade Subcontractors: A Foreman's Workflow
How electrical, plumbing, masonry and other trade subs can run timecard approvals: two-layer review, deadlines, what to check, corrections and records to keep.

QuickBooks Retainage Setup for Trade Subcontractors
Set up retainage in QuickBooks Online or Desktop: the two accounts, one item, the negative line on progress invoices, and how to bill the release.

Count Takeoff From a PDF: A Method Trade Subs Can Audit
How to do a count takeoff from a PDF plan set: check the sheets, set the scale, count by type, catch misses, and hand the numbers to your estimate.

Estimating Assemblies Setup: A Trade Sub's Step-by-Step Guide
Set up estimating assemblies the way a trade sub actually bids: define the unit, build the line items, tie them to takeoff, and check the math before you submit.

Ball in Court Tracking for Trade Subs: Who Has the Submittal?
Ball in court tracking for electrical, plumbing, HVAC and other trade subs: how to see who owes the next action on submittals and RFIs, and chase it.

Low Voltage Estimating: How to Price Division 27 Bids
A practical low voltage estimating method for specialty subs: define scope, run the takeoff, price labor and markup, and avoid the gaps that sink Division 27 bids.

Addenda Review Process for Trade Subs: A Bid-Day Workflow
A step-by-step addenda review process for specialty trade estimators: log, compare, reprice, acknowledge and document every addendum before the bid goes out.

Bid Follow-Up for Trade Subs: What to Send and When
A practical bid follow-up process for specialty trade subs: the 3 to 4 touchpoints, what to say to the GC, how to ask after a loss, and how to track it all.